COMMAND AREA DEVELOPMENT AUTHORITY,NASHIK

                                                                  OZERKHED   PROJECT                                                                      wpe4.jpg (1021 bytes)

VI

Area

IX

R.B.C.

1

GCA

18751

Ha.

1

Length

--

K.m.

2

CCA

14857

Ha.

2

B.W.

--

M.

3

ICA

10400

Ha.

3

F.S.D.

--

M.

4

Crop Area

10400

Ha.

4

F.B.

--

M.

VII

Water Level

5

Discharge at head

--

Cumecs

1

TBL

653.34

M.

6

Bed Slope

--

--

2

MWL

650.82

M.

X

L.B.C.

3

FRL

648.3

M.

1

Length

49

K.m.

4

Crest Level

648.3

M.

2

B.W.

4.8

M.

5

MDDL

634.29

M.

3

F.S.D.

1.7

M.

6

Outlet Sill Level

632.40

M.

4

F.B.

0.45

M.

7

River Bed Level

618.13

M.

5

Discharge at head

13.60

Cumecs

VIII

Design Flood Discharge

2400

Cumecs

6

Bed Slope

1:4000

--


Back